1997: breaking ground
1998: the site opens to the public
1999 – 2000: bridging the gap
2001: waterworks
2002: the first cross-rib vault
2003: a second vault: a groin vault in the Great Tower’s basement
2004: home on the range
2005: a second cross-rib vault
2006: the North Range’s ground floor is complete
2007: the Great Hall rises
2008: raising the roof timbers
2009: first fireplaces are in service
2010: building work on the North Range is completed
2011: the castle’s largest vault is brought under load
2012: the first mural paintings
2013: the two towers
2014: work begins on building the chapel
2015: the chapel’s vault is complete
2016: a second wall-walk is nearly complete
2017: our 20th anniversary
2018: the first tower is crowned
2019: the Chapel Tower’s roof is on!